Post-press binding operation for bookbinding staples

The operation principle of the collating machine mainly includes the following points:

(1) All preparations should be done before the machine, such as lubricating oil, rough inspection of all major parts, adjusting the baffle, and placing the entire station in proper position;

(2) The post-storage staff will store the booksposts in order according to the order, and each checkout will be checked with the book and the sample book to check whether it is correct. The check-in will be confirmed by the leader, the assistant, and the store staff (or the monitor). Can be allocated pages;

(3) The stored hanging posts must be flat and free of empty cars. The height of the store posts must not exceed 150 mm.

What are the operating procedures of the host computer on the wireless glue binding linkage line?

A: The main operating procedures of the package include the following:

(1) Make all preparations before starting the machine, such as storing the rubber material, storing the heat adhesive in advance, adjusting the glue temperature, adding lubricating oil, checking the main parts, adjusting the rules, checking the correctness of the book block and the cover, etc.;

(2)Before starting the machine, it is necessary to send a signal, take care of the cooperation of the front and rear machines, and try to open the car, gradually changing from the slow speed to the normal speed;

(3) Observe the condition of the equipment and the book to be qualified at any time during normal operation, and ensure that the bonding, clamping, and shaping work is completed within the open time of the glue to ensure that the opening, curing, and cooling time are normal;

(4) Observe whether the glue temperature is normal at any time, it is forbidden to change the use temperature of the glue and store the glue block directly into the working glue pot;

(5) When the plastic pot is cleaned on time to ensure that the colloid purity and the plastic pot are clean and the equipment is operating normally, the pre-adhesive pot is cleaned once every quarter and the plastic pot is cleaned once every two weeks.

What are the operating procedures for the book cutter on the wireless glue binding linkage line?

Answer: The operating rules of the book cutter mainly include the following points:

(1)Before starting the machine, we must do all the preparations, such as adding lubricating oil, checking the main parts and the rules of cutting books, whether the cutter plate and the conveying track are clean, and adjusting the rules and pressures of the books;

(2) Send a signal before starting the machine and open the empty car first.

(3) When the books are cut into different books, they must stop and handle. It is strictly forbidden to grab the knife (that is, to touch the book in the condition of not stopping). It is also necessary to check whether the size of the book is correct and find the problem in time. deal with.

What are the operating procedures for wireless glue sticking line inspection equipment?

Answer: The operating procedures of the scratch inspection equipment mainly include the following points:

(1) Wipe the equipment on the entire linkage production line on time to ensure that there is no oil stains on the production line and that the air path is unimpeded;

(2) In the scratch inspection, it is necessary to check the problems that need minor repairs or need to replace the vulnerable parts immediately to solve the problem, to ensure the normal operation of the equipment after the scratch inspection;

(3) In the case of normal operation on the equipment, a single shift (8 to 12 hours/day) is rubbed once every two weeks, and 2 or 3 shifts (16 hours/day or more) are rubbed twice per week. The rubbing inspection time is generally 4 hour.

What are the operating procedures for wireless glue bonding line maintenance equipment?

A: The operating procedures for maintenance equipment mainly include the following:

(1) Under normal circumstances, the linkage production line needs 3 to 5 years of repairs, 10 years or more require major repairs, with the exception of special circumstances;

(2) When the equipment needs to be repaired, it is firstly required by the leader to request the repair, which can only be approved by the workshop equipment director, and the time and deadline for the repair must be specified;

(3) When the equipment needs major repairs, firstly the chief engineer (above the senior engineer) or the technical staff shall ask for the overhaul request. The person in charge of the workshop agrees to formulate the overhaul plan. After the overhaul plan is formulated, the person in charge of the workshop and the director of the factory-managing equipment shall be required. Study and approve, fix the time limit before repairing;

(4) During the middle and overhaul operations, the pilot (above the senior engineer) or the technician must follow the repairs to assist in the inspection of the maintenance personnel;

(5) When the overhaul is completed, the person in charge of the workshop (when in repair) or the person in charge of the equipment of the factory (when overhauling), the person in charge of inspection, and the pilot of the tripartite inspection will be required to sign 30,000 after passing the inspection.

What is the paste shell machine operating procedures?

Answer: The operating procedures of paste shell machine mainly include the following points:

(1) Make all preparations before starting the machine, such as adjusting the procedures of each table, sucking arm, suction plate position, etc., and storing good materials and lubricating oil in advance;

(2) When starting the machine, give a signal, and check whether the glued book shell meets the requirements after the test machine, and then correct operation can be performed without errors;

(3) It is necessary to check the quality of the shell of the book at any time during normal operation, and to immediately stop the processing when the size is found to be unqualified;

(4) The glue used for paste shell is animal glue. The temperature in glue pot should be guaranteed to be between 75±10°C, and it is forbidden to add cold water during normal use;

(5) Clean the plastic pot on time to ensure that the adhesive fluid is normal. Under normal circumstances, the plastic pot should be cleaned once in the first quarter in order to avoid aging and deterioration of the colloid;

(6) The height of the storage board: 16 to 200mm, 32 to 300mm (about the same height as the bucket);

(7) Wipe the equipment on time. Under normal operating conditions, wipe it out every two weeks and do a good job of cleaning after class to ensure the normal production of the next shift.

What are the operating procedures for winding up the ridge?

A: The following are the main points of operation of the ridge lifting machine:

(1) Make all preparations before starting the machine, such as adjusting the rules of the book format and thickness, such as the book holder, the rounder, and the wedge plate;

(2) For books that need to be rounded, the backing adhesive should be appropriate, the degree of drying of the adhesive should be 70% to 80%, and it is forbidden to completely dry and then round;

(3) The height of the ridges shall be based on the thickness of the board, and the arc of the wedge shall be based on the thickness of the booklet;

(4) In the normal operation, it is necessary to observe the situation of the ridge and ridge at any time, find out the problem in time, and ensure that the quality meets the requirements;

(5) The procedures for the inspection and maintenance of equipment are the same as those for other equipment.

What is the shell machine operating procedure?

Answer: The operating procedures of the shell machine mainly include the following points:

(1) Make all preparations before starting the machine, and adjust the specifications of the rules according to the thickness of the book block;

(2) The liner machine with a lining shall be adjusted in advance for the distance between the adhesive used and the roller used for coating, and shall be secure and smooth after the cover is secured;

(3) In the normal operation, the effect of the splicing (sweeping) should be inspected frequently, and problems must be dealt with in a timely manner;

(4) The procedures for the inspection and maintenance of equipment are the same as those for other equipment.

The Whole Body Vibration Machines are very important for overall training in fitness centers, especially for female fitness lovers.  Because it can enhance the effects of fitness training and also adds novelty, variation and fun. Our whole body vibration machines not only offer a Total Body Training, but also make you enjoy a massage training. For a professional gym club, whole body vibration machines are a key gym device in fitness as it enhances flexibility and range of motion while strengthening muscles and balance. What's more, the Whole Body Vibration Machine is the scientific answer on non-surgical body shaping.

Whole Body Vibration Machine

Gym Body Slimmer, Body Vibration Machine, Whole Body Vibration, Fitness Body Shaper, Body Building Euipment, Exercise Equipment, Inexpensive Exercise Equipment

Guangzhou Kangyi Sporting Goods Co., Ltd. , https://www.ganasgym.com