PVC sports floor installation steps.doc

I. Installation classification 1. Mobile installation: The floor and the floor are bonded together by the special connecting belt of the manufacturer. The floor and the floor surface are not bonded. The PVC sports floor can be rolled up or removed at will, which is convenient for movement. 2. Fixed installation: semi-fixed: special double-sided tape, the floor and the floor are bonded together with the special double-sided tape of the manufacturer. At the same time, the floor and the floor are also bonded together, which can effectively prevent the floor. It takes a lot of movement to move and slit, so it is convenient to move the entire site in the future. Partial bonding: 20 cm of adhesive bonding on the floor with the edge of the floor as the reference. Fully glued: all glued on the floor to be laid. Second, the installation requirements The construction of the ground floor must be clean, long-lasting clean, high flatness, and no cracks. The concrete floor moisture content cannot exceed 2.5%. The moisture content of the gypsum floor shall not exceed 0.5%. Before the floor is laid. After the floor is dusted, PVC sports flooring can be laid. If the original ground is uneven, it can also construct self-leveling of about 2mm. If it is non-absorbent ground such as mineral base, stone, ceramic tile, etc., it can be directly paved. Note: If it is a wet floor such as a basement, the floor must be waterproof to isolate the water vapor. Third, the installation steps must be smooth and clean. Before the PVC sports floor is laid, it must be laid out in advance to lay the ground for more than 24 hours, and the on-site temperature should not be lower than 15 °C. After the floor is restored, the ends should be kept 5 cm more. Before pasting, roll the unfolded floor back about halfway, then scrape the glue – starting from the middle – the glue is applied with a toothed scraper. Arrange in the order of the number of the floor, align and merge, pay attention to the alignment of the site line during the paving process. Open the adjacent two pieces of floor along the joint, place the special connecting belt of the manufacturer on the lower side of the joint, brush the glue on the surface of the joint, first stick one of the plates to the half of the joint, then add another Half stick to the remaining connecting straps and hold the gap tight. It is recommended to use water-soluble glue that is harmless to the human body for construction. When the floor is pasted, use the cork block to squeeze the floor surface from the middle to the ends so that it is flat without leaving air bubbles, and the roller is completely rolled flat. After the floor is covered, it is grooved and welded. After welding, the wire should be leveled.

Camouflage Raincoat


Detailed Description:
Product Name : Camouflage Raincoat
Camouflage Raincoat is made of PVC polyester pvc. Nylon pvc etc durable material.
Usage: Camouflage Raincoat is very suitable for outside workers .high quality waterproof function.
Service: ODM, OEM and buyer label service available.



Size

Each size is available standard size is for child raincoat is: 2~12years old

Material

PVC/PU/EVA/PE/PEVA/POLYESTER.etc

Design

Designs can be choosen, customized works

Feature

High quality with lower price.

Color

customized

Logo

Offset printing, screen printing

Package

Plastic bag

Sample Cost

According to item`s work and value

Sample Time

In 7days.

leading time

30 days


Motorcycle Rain Coat, Safety Rain Suits, Camouflage Raincoat, Camo Rain Gear

Zhejiang CC Industrial And Trading Co., Ltd , https://www.ccraincoats.com